Use the following exercises to get acquainted with the Business Studio Simulation Module:
Design a process diagram with the following sequence of shapes: a start event, a task, an end event. Develop an Event instantiation model for the start event (use the
Modelling Activation of a Process Instance article) and run the simulation.
-
Design a process model with a sequence of several tasks and run the simulation.
Design a process model with a sequence of parallel tasks (use the
Parallel Branches article) and run the simulation.
Design a process model that contains OR/XOR branches (use the
Sequence with OR/XOR article) and run the simulation.
Simulate performance of 2 separate processes that are not connected to each other.
-
Design a process model that has a sub-process and run its simulation. Use the
Design a Sub-Process article.
-
Note that each exercise should end with the careful analysis of the simulation results.